Agenda and minutes
Venue: Warspite Room, Council House. View directions
Contact: Hannah Chandler-Whiting Email: democraticservices@plymouth.gov.uk
| No. | Item | ||||||||
|---|---|---|---|---|---|---|---|---|---|
|
Declarations of Interest Members will be asked to make any declarations of interest in respect of items on this Agenda. Minutes: The following declarations were made:
|
|||||||||
|
To confirm the minutes of the meeting held on 01 April 2025. Minutes: The minutes of the meeting held on 01 April 2025 were agreed as an accurate record. |
|||||||||
|
Chair's Urgent Business To receive reports on business which, in the opinion of the Chair, should be brought forward for urgent consideration. Minutes: There were no items of Chair’s urgent business. |
|||||||||
|
Role of an Audit Member Minutes: Barrie Morris (Grant Thornton) presented the item and discussed:
a)
The importance of the Audit and Governance Committee
in providing independent assurance on governance, risk management
and control;
b)
The need for members to ask challenging and
constructive questions;
c)
It was important that Committee members were
satisfied with the actions of management;
d)
The role of the Committee as non-political, focused
on scrutiny rather than policy;
e)
Important that if there was anything that
wasn’t understood, that questions were asked to change
this; f) Offered to meet with Committee members in private, without Council officers present, especially as this was recognised as good practice.
Following questions, the discussion covered:
g) “Non-political” referred to avoiding partisan behaviour, not excluding political insight or lived experience.
|
|||||||||
|
Plymouth City Council Audit Plan 2024/25 Minutes: David Johnson (Grant Thornton) introduced the report and discussed:
a)
There were reflections in the report from Grant
Thornton on local government reorganisation and that the initial
requirement of new Council boundaries to have at least 500,000
people within them, wouldn’t always be achievable, as was
expected across Devon;
b)
Reform of local audit was also underway with a
proposal to set up a new local audit office with a number of
responsibilities;
c)
Plymouth was an area that had been especially
impacted by the backstop and Grant Thornton, as an audit firm, and
the local government market, did not want to return to that
position, so Grant Thornton continued to feedback on how best
reforms and process changes could be managed;
d)
IFRS16 leases were new and came into force 01 April
2024 and Grant Thornton would be focussing on ensuring that the
processes that management had put in place were appropriate and
that the disclosures within the financial statements were
appropriate and accurate;
e)
The backstop deadline for 2024/25 accounts was 27
February 2026 and Grant Thornton would keep Committee members
informed of the work to gain reassurance over the opening balances
for that year and how it would impact the 2024/25 audit
opinion;
f)
Key risks identified included management override of
journals and valuation of land and buildings, investment
properties, and the pension fund;
g)
Revenue cycle and expenditure cycles were mandatory
risks, but Grant Thornton had made an assessment that they did not
consider these to be of significant risk for Plymouth City Council
(PCC);
h)
Recommendations made following the 2023/24 audit
would be chased and would be reported on at future
meetings;
i)
The Financial Reporting Council (FRC) had reviewed
Grant Thornton files all as good or limited improvements
required. In
response to questions, the following was discussed:
j)
The Committee could be reassured that Grant Thornton
would report completed actions via reports, which would then be
checked through the FRC’s programme of reviews;
k)
It was explained that a legal 2025/26 budget was
able to be set without a final resolution to the capitalisation
direction, a further update from Government was expected
imminently;
l)
ACTION Ian
Trisk-Grove agreed to work with Grant Thornton on a response to
Councillor Finn's query around whether the capitalisation and
pension transaction were linked;
m)
Grant Thornton were planning on spending more time
working on site in Plymouth as they found that to be more efficient
as well has having weekly meetings with Council officers;
n)
The Audit Plan set out any areas that Grant Thornton
believed to have a risk or significant weakness; o) If appropriate arrangements are not in place in an area of concern, officers would be made aware.
|
|||||||||
|
Internal Audit End of Year Report 2024/25 Additional documents:
Minutes: Louise Clapton (Devon Assurance Partnership) introduced the report and highlighted:
a)
The public sector internal audit standards and
global internal audit standards that came into force from the 01 of
April 2025 required the chief internal auditor provide an annual
report providing an opinion that could be used by the organisation
to inform its governance statement:
b)
Based on work carried out throughout 2024/25, the
Chief Internal Auditor had given an assurance opinion of reasonable
assurance;
c)
Whilst there were generally sound systems of
governance, risk management and control in place, some areas for
improvement had been identified;
d)
The report included an assurance map for the work
completed in 2024/25, a new addition to the report, which provided
a visible representation of the assurance results;
e)
90% of the revised audit plan had been
delivered;
f)
86% of assurance opinions were rated reasonable or
substantial;
g)
14% of audits had limited assurance;
h)
The Council had made notable progress in addressing
management actions arising from internal audits with limited
assurance ratings;
i)
As of 31 March 2025, the number of audits with
outstanding management actions had reduced from 15 to 10 since 31
March 2024;
j)
Seven audits had fully implemented all management
actions and had been removed during 2024/25, reflecting a positive
downward trend; k) Devon Audit Partnership (DAP) had been externally assessed and received the highest rating of ‘generally conformed’.
In
response to questions, the following was discussed:
l)
Delays in implementing actions were mostly due to
system upgrades and strategic planning, which were understandable
and senior officers were aware;
m)
Although some audits had a finance focus, sometimes
they also had an impact on other directorates;
n)
Audits were prioritised based on the Council’s
pressures, risks and objectives;
o)
It was challenging for the audit teams to work
across all of the various teams involved in areas such as
children’s services and adult services, who had their own
teams, but also worked with others such a finance and business
support;
p)
The new Eclipse system was looking to streamline
information, raise standards and bring people to work more easily
together, which would also make auditing easier; q) The Better Care finance system was due to be implemented in September 2025.
The
Committee agreed: 1. To note that based on work performed during 2024/25 and previous years’ audit, the Head of Internal Audit’s opinion was of “Reasonable Assurance” on the adequacy and effectiveness of the Authority’s internal control framework. |
|||||||||
|
Counter Fraud Service Annual Report 2024/25 Additional documents: Minutes: Tony Rose (Devon Assurance Partnership) introduced the report and highlighted:
a)
A new ‘failure to prevent fraud’ offence
would come into effect from September 2025 and the team would be
working with the Council to update the relevant policies; b) Support from Plymouth City Council (PCC) had continued to be proactive.
The Committee agreed:
1. To note the annual report.
|
|||||||||
|
Draft Statement of Accounts 2024/25 Additional documents:
Minutes: Carolyn Haynes (Lead Accountancy Manager) presented the item and discussed:
a)
The Draft Statement of Accounts 2024/25 had been
published by the statutory deadline on 30 June 2025;
b)
The audited accounts would need to be signed off by
27 February 2026;
c)
The introduction of IFS16 leases was a major
implementation for the team to work on and introduced the concept
of a right of use asset for all qualifying leases, including those
with nominal or peppercorn rents;
i.
This approach eliminated the previous distinction
between finance and operating leases for lessees;
ii.
All leases, except those with a term of less than 12
months or of a low value, were recognised on the balance sheet,
regardless of the transfer of risks and rewards;
iii.
To complement the new standard the accounting
policies within the statement of accounts had been
updated;
iv.
In advance of the implementation date of 01 April
2024, PCC conducted a comprehensive review of all lease
arrangements and, as a result, 59 land and building leases, 32
equipment leases, and eight vehicle leases were identified for
recognition on the balance sheet;
v.
PCC’s private finance initiative (PFI’s)
lease models were also reviewed in consultation with treasury
management advisors to assess the impact of the introduction of
IFS16 and resulted in a net reduction of £10.8985;
vi.
The recognition of right of use assets and
corresponding lease liabilities increased the Council’s
reported borrowings, which in turn raised the capital financing
requirement and authorised debt limits;
vii.
No new money had had to be borrowed, the rents paid
through the accounts were converted into an asset, recognising the
minimum revenue provision through the accounts;
d)
PCC’s assets were £435 million greater
than its liabilities, reflecting a downward movement of £40
million from 2023/24 due to various movements in the
Council’s assets and liabilities; e) Property, plant and equipment assets had increased by £61 million due to a combination of asset revaluation and acquisition of new assets through the capital programme.
In response to questions, supported by Ian Trisk-Grove (Service Director for Finance), the following was discussed:
f)
PFI’s had remained fairly static and a
forensic review had been undertaken due to the introduction of
IFS16 and there would be no impact on the council tax payer as this
was purely an accounting adjustment;
g)
Local government reorganisation (LGR) narrative did
not impact this set of accounts; h) The autumn white paper on SEND (Special Educational Needs and Disabilities) was expected to address the Government’s position on next steps for dedicated school grants, but in the meantime finance colleagues were working closely with those in the education department on internal mitigation plans around managing costs associated.
The Committee agreed:
1.
To note the report;
2.
To note the draft (unaudited) Statement of Accounts
2024/25, which were published by 30 June 2025 in accordance with
the requirements of the Accounts and Audit Regulations 2015 (as
amended); 3. To note the Statement of Accounts for 2024/25 would be ... view the full minutes text for item 8. |
|||||||||
|
CIPFA assurance review – findings and response Minutes: Ian Trisk-Grove (Service Director for Finance) provided a verbal update:
a) Eight recommendations had been made by the review, all of which had been addressed and were incorporated into the Annual Governance Statement. |
|||||||||
|
Annual Governance Statement Additional documents:
Minutes: The report was introduced by Ian Trisk-Grove (Service Director for Finance) who highlighted that:
a)
The statement included progress and plans to make
progress made against:
i.
External audit recommendations;
ii.
Issues identified in the Annual Governance Statement
2023/24;
iii.
Key delivery areas;
iv.
Areas for continuous improvement;
v.
CIPFA review recommendations;
vi.
Armada Way Independent Learning Review (AWILR)
Action Plan. Following questions, supported by Liz Bryant (Service Director for Legal Services), these topics were covered:
b)
The relevant scrutiny panel would
be made aware of the priority action areas for Adult Social Care
ACTION;
c)
Any changes to the constitution
could be considered by the Constitution and Civic-Sub Committee,
following any relevant recommendations from the Armada Way Action
Plan Sub-CommitteeACTION;
d)
Regular monitoring and forecasting reports, with
regards to insufficient built-in growth for adult and
children’s social care pressures, would be produced and sent
to the relevant Scrutiny Management Board meetings as well as
reports to engage with the corporate management team, working on
plans to achieve a balanced budget in these areas despite
pressures;
e)
It was suggested that for the next
AGS statement a survey would also be undertaken to seek the views
of Councillors, as well as those of senior officers ACTION. The
Committee agreed: To approve the Annual Governance Statement, alongside the Statement of Accounts, prior to signature by the Leader, Chief Executive and Service Director for Finance (S.151 Officer). |
|||||||||
|
Armada Way Action Plan Sub-Committee Report Additional documents:
Minutes: Liz Bryant (Service Director for Legal Services) introduced the report:
a)
A resolution had been made at the City Council
meeting of 02 June 2025 that the Audit and Governance Committee
establish a cross-party sub-committee to oversee the implementation
of the action plan; b) The report outlined the proposal for such a cross-party sub-committee.
In response to questions, the following was clarified:
c)
The action plan was based on the content of the
AWILR report and so the actions related directly to issues
identified within it; d) The sub-committee would report back into the Audit and Governance Committee.
The Committee agreed:
1.
To establish a cross-party sub-committee to oversee
the implementation of the Action Plan presented to City Council on
02 June 2025 in response to the Armada Independent Learning Review
Report; 2. Delegated the authority to approve the Terms of Reference, membership and arrangements to the Chair and Vice-Chair of Audit and Governance Committee in discussion with the Monitoring Officer.
|
|||||||||
|
Health, Safety and Wellbeing Annual Report 2024/25 Additional documents: Minutes: This item was introduced by Kirstie Spencer (Head of Health, Safety and Wellbeing) who highlighted:
a)
Lone working device programme had been developed and
was being rolled out across the Council;
b)
Stress and incidents involving violence and
aggression had continued to rise, which highlighted the importance
of maintaining the safety and security of staff across all Council
services;
c)
A stress survey was live for staff to
complete;
d)
A detailed training programme had been undertaken
with the corporate management team on accountabilities and
responsibilities; e) Closing incidents on time was an area for improvement.
In response to questions, supported by Chris Squire (Service Director for HR & OD), the following was discussed:
f)
More incidents were being reported, but the increase
was in lower level incidents, rather than higher level;
g)
Near misses had increased, but this was expected to
be due to people being more aware and more supported in reporting
hazards;
h)
Risk assessments were not held centrally and work
was ongoing to change this and move risk assessments onto the
Assure system;
i)
It would be worth speaking to colleagues at
Livewell to share best practice and
learnings with regards to addressing micro-aggressions experienced
in the workplace ACTION;
j)
A new People Strategy was being developed;
k)
The stress survey was anonymous, though information
was being gathered on where the responses were coming from within
the organisation;
i.
200 responses had been received on the first
day;
ii.
The survey had been created with the Health and
Safety Executive (HSE)’s stress management standards in
mind;
iii.
Data from the survey would be used to shape further
work;
l)
Health, safety and wellbeing (HSW) had to be rooted
in common sense, but each incident required its own assessment and
it was down to the person reporting an incident whether they
interpreted a something as an incident
of micro-aggression;
m)
It was important to ensure that customer-facing
staff were trained in de-escalation techniques but were also not
discouraged from making reports; n) Occupation health provision continued to be of a good standard, but there were reporting issues, but this was expected to improve with the implementation of iTrent - the new HR system.
The Committee agreed:
1.
To continue to support the management and
improvement of HSW across the organisation, to ensure that all duty
holders (Councillors, Managers and Staff) were undertaking
mandatory and role specific HSW training; 2. To communicate and role-model positive HSW performance and actively improve, maintain and own operational HSW competency.
|
|||||||||
|
Treasury Management Outturn Report 2024/25 Minutes: Presented by Wendy Eldridge (Lead Accountancy Manager), the introduction to this report covered:
a)
The Council capital financing requirement had
increased: On 02 June 2025 the provisional Capital outturn
was presented to the City Council with the outturn position as at
31 March 2025 totalling £109.309m with 31% being financed
through borrowing, this together with accounting treatment of
capital grants used to finance the capital programme where
conditions under the terms of grant funding gave a CFR (Capital
financing requirement) of £870m and net borrowing increasing
by £47m from £656m to £703m;
b)
There had been an £11m downward adjustment to PFI liability
due to the implementation of new accounting standard IFRS16 form 01
April 2024;
c)
PCC’s chief objective when borrowing was striking balance
between securing lower interest rates/costs and cost certainty,
with flexibility to renegotiate loans;
d)
PCC’s average interest rate for borrowing was
3.27%, lower than the investment return;
e)
Investment activities showed a shift with additional
cash invested within money market funds, the increase in cash was
due to additional income through payment of accounts and receipt of
grant monies;
f)
The Council had maintained pooled investments with
Shroder, Fidelity and CCLA investment, with other investment held
with Altana Social Investment Fund which had generated nearly
£3m from the original £50m investment and was
generating the highest yield;
g)
The capital value of pooled investment funds stood
at £48.464m at 31 March 2025 and was below original
investment - the unrealised loss from the downward valuation did
not have an impact on revenue budgets or the general
fund;
h)
The return and holding held from the Property
regeneration fund, categorised as non-treasury holdings, had
generated a positive return of 1.41% after taking account of direct
costs including borrowing costs;
i)
The 2024/25 revenue outturn position was a favourable variation of
£6m. The following was
discussed in relation to questions:
j)
The threshold level of fixed rate exposure for borrowing was
exceeded during the year was detailed in paragraph 41, rather than
42 as mentioned on the cover sheet;
k)
Borrowing activity showed a movement towards PWLB
(Public Works Loan Board) borrowing;
l)
Higher fixed rate interest costs were incurred in
2024/25 as the Council switched part of its borrowing from short
term to longer term PWLB borrowing with fixed rates to limit
exposure to the risk of higher interest rates;
m)
Although existing borrowing was above the liability
benchmark for 2024/25, it was forecast that existing borrowing in
2025/26 and 2026/27 would be below the liability benchmark, showing
a forecast for improvement. The Committee agreed:
1.
To approve the Treasury Management Annual Report
2024/25; 2. To note that the threshold level of fixed rate exposure for borrowing was exceeded during the year.
|
|||||||||
|
Procurement Strategy Report 2024/25 Additional documents: Minutes: Philip Simons (Procurement Lead) introduce the report and highlighted:
a)
The report outlined PCC’s progress to delivery
it’s procurement strategy, highlighting the achievements over
the past year and setting out the priorities for the year
ahead;
b)
The strategy aligned with the Procurement Act 2023,
which came into effect in February 2025 and reflected both national
and local priorities, including social value, climate action and
economic inclusion;
c)
There was a strong focus on continuous improvement,
partnership working, and readiness for future statutory
changes. Councillor Raynsford offered the following comments which were echoed by the Chair:
d)
Thanks to the PCC procurement officers for their
wide range of knowledge and procurement that had to be
undertaken; e) It was positive to see the number of PL postcode suppliers was increasing.
The Committee agreed:
1. To note the progress made to date and endorse the planned actions.
|
|||||||||
|
Risk Management Monitoring Report Additional documents: Minutes: Ian Trisk-Grove (Service Director for Finance) introduced the report and highlighted the following points:
a)
There were three key risks:
i.
To bring better focus to where key issues were being
managed around broader social care sustainability;
ii.
Cyber security;
iii.
Management of the financial position and resilience
of the authority as it navigated challenges in the medium-term
financial plan;
b)
Three new risks had been introduced in relation to
the following topics:
i.
LGR and devolution;
ii.
Legislative change;
iii.
Risk management; c) Further work was being done in partnership with DAP around risk management to develop strategic risks, but also to looking forward to organising some workshops with different areas of the authority to identify operational risks.
In response to questions, the following was discussed:
d)
The maximum risk score was 25;
e)
Two workshops were booked in with DAP and the
corporate management team so that there was shared ownership and
understanding of strategic risks;
f)
Further updates on the work with DAP would be
provided at future committee meetings;
g)
The risk register referred to risks for the Council,
rather than a risk for the city;
h)
It was hoped in the future there would be better
engagement with risk through processes that were already in place,
such as business cases, and potentially the setting up of an
officer risk group. The Committee agreed:
1. To note the Strategic Risks Quarter 4 2024/25 report.
|
|||||||||
|
Whistleblowing Policy Minutes: Liz Bryant (Service Director for Legal) introduced the item and highlighted the following:
a) The amendments were in red and the requested amendments from the previous year were also set out in the report.
In response to questions, the following was discussed:
b)
It was requested that paragraph 7.1 (g) needed to be
reworded to ‘their individual
MP’
ACTION;
c)
More information on how contractors
were made aware
of the Whistleblowing Policy would be
provided to the Committee ACTION;
d)
Councillors were not covered by the
policy as per legislation, and if Councillors were to
‘whistle blow’, they would be covered by the standards
regime. The Committee agreed:
1. To approve the updated Whistleblowing Policy.
|
|||||||||
|
Annual Information Governance Statement Additional documents: Minutes: Presented by John Finch (Information Governance Manager) and Peter Honeywell (Cyber Security Lead), the following points were covered during the introduction to the report:
a)
The number of Freedom of Information (FOI) and
Subject Access Requests (SARs) had increased, and benchmarking
showed that this was a regional trend;
b)
Compliance rates had improved due to increased
capacity in team members and training;
c)
It was important to continue staff training to
minimise data breaches;
d)
There was a serious, and increasingly sophisticated,
threat from cyber criminals, using a range of different mechanisms
to attack;
i.
Defence to cyber attacked included staff training to
recognise attempts and how to correctly respond and report
them;
ii.
Since KnowBe4 training had launched, there had been
a significant reduction in the risk profile, monitored through the
questionnaires and quizzes staff responded to as part of their
training;
e)
PCC had set up a cyber board with DELT Shared
Services, the Council’s IT provider, which met on a monthly
basis to discuss and review the Council’s risk profile and
agree investments and implementations that would lead to a
reduction in risk. In
response the questions, the following was explained:
f)
Government
recommendations in relation to local authority cyber attacks was to
not pay any ransom and a law was expected to be introduced later in
2025 that would prohibit any public authority from paying a
ransom;
g)
Completion of training was tracked and
chased;
h)
Anyone who took the bait in a phishing tests was
required to complete specific additional training;
i)
KnowBe4 offered a management dashboard so that
managers could monitor progress and raise issues as part of routine
performance management arrangements;
j)
The BitLocker codes worked well to stop attackers
from getting into Council laptops, and there shouldn’t be
data stored on a Council laptop, but this would remain encrypted
without the log on details of the user of the laptop, making it
very hard to get any information from a stolen laptop, and mobiles
devices if lost were remotely wiped of data. The
Committee agreed: 1. To note the report.
|
|||||||||
|
Minutes: The Committee noted the acion log. |
|||||||||
|
Minutes: There was a request to add the following to the work programme:
a) Pre-referendum guidance that included a timeline and detail on where it matched pre-election guidance, and where it didn’t, explanations why not.
The Committee noted the work programme.
|

PDF 81 KB